Please click on the link to access our Bids Online system. Here you can view current bids, search bids, and register as a vendor. Selecting the link below will take you outside the City’s website.
Bulletin Board Requirements
The prime contractor must erect a bulletin board on the construction site for posting notices required by Federal and State laws. The bulletin board must be located in a conspicuous place and be available at all times to employees and applicants for employment. Employees must be able to view the required United States Department of Labor and FHWA posters. A binder with the required posters has been deemed an unacceptable alternative to a bulletin board. Federal posters are posted at: http://www.fhwa.dot.gov/programadmin/contracts/poster.cfm
Projects Currently Accepting Bids
The City is accepting bids from contractors who are interested in performing the works as described in the contract documents. Bidding documents are accessible on PlanetBids and the date of the first public notice is Monday, June 30, 2025.
Project No.: | CIP 13-22 |
Project Title: | Leonard Avenue Bridge Replacement |
Location: | Leonard Avenue 900’ South of Bullard Ave |
Scope of Work: | This project shall consist of replacing the existing two-lane Leonard Ave Bridge with an 8-ft by 14-ft reinforced double box culvert, constructing roadway pavement, and canal embankments. The construction shall involve all labor, materials, tools and equipment for clearing, grubbing, saw-cutting, excavation, earthwork, engineering fill, grading, backfilling, compaction, demolition of existing reinforced box culvert, headwalls, wingwalls and all related improvements, removal of existing concrete inlet and drain pipe to the treatment plant, construction of reinforced concrete improvements such as double box culvert, deck sidewalks, curbs, gutters, barriers, parapets, wingwalls, channel lining and pier/trash rider, installation of geotextile fabrics, rock slope protection, tubular hand railing, chain-link railing, steel casing, utility vaults and lids, access/safety ladders, construction of roadway asphalt concrete pavement, aggregate base, canal embankments, and installation of traffic striping and signage. |
Estimate: | $1,913,719.00 |
Contract Time: | Fifty (50) Working Days |
License: | California Contractor License Class A or C8 |
Open Date: | Tuesday, August 5, 2025 at 2:00 p.m. |
Bid Documents: | Digital copies of construction documents and all related bidding documents can be downloaded for free online at PlanetBids. |
Contact: | Nate Stava, Civil Engineer (559) 324-2382 |
2nd Contact: | Fernando Copetti-Visciglio, Supervising Civil Engineer (559) 324-2394 |
______________________________________________________________________________
Project No.: | CIP 22-08 |
Project Title: | Shepherd Avenue Interconnect |
Location: | Various Locations within the City of Clovis |
Scope of Work: | The project involves trenching/boring and installation of conduit, pull boxes, cabinets and all system components and power, fiber optic cable, and system connections to traffic signals and communication cabinets along Shepherd Avenue from Willow Avenue to De Wolf Avenue, connecting back to Planning & Development Services building and the Police Department building through two routes. |
Estimate: | $1,335,171.00 |
Contract Time: | Seventy (70) Working Days |
License: | California Contractor License Class A or C10 |
Open Date: | Tuesday, July 22, 2025 at 2:00 p.m. |
Bid Documents: | Digital copies of construction documents and all related bidding documents can be downloaded for free online at PlanetBids. |
Contact: | Nav Chahal, Engineer I (559) 324-2353 |
2nd Contact: | Fernando Copetti-Visciglio, Supervising Civil Engineer (559) 324-2394 |
______________________________________________________________________________
Project No.: | CIP 23-08 |
Project Title: | Sunnyside Avenue Street Improvements |
Location: | Sunnyside Avenue from Shaw Avenue to Barstow Avenue |
Scope of Work: | This project involves ±0.50 miles of street improvements on Sunnyside Avenue from Shaw Avenue to Barstow Avenue including removing and replacing existing AC Pavement, replacement of curb returns, drive approaches, median island caps, adjustments of utility boxes, manholes, and utility valve boxes to finished grade, replacements of traffic striping, markings and signage, traffic signal modification, and reinstallation of traffic loop detectors. |
Estimate: | $950,720.00 |
Contract Time: | Twenty-Five (25) Working Days |
License: | California Contractor License Class A or C12 |
Open Date: | Tuesday, July 15, 2025 at 2:00 p.m. |
Bid Documents: | Digital copies of construction documents and all related bidding documents can be downloaded for free online at PlanetBids. |
Contact: | Matthew Morillas, Civil Engineer (559) 324-2374 |
2nd Contact: | Fernando Copetti-Visciglio, Supervising Civil Engineer (559) 324-2394 |
_____________________________________________________________________________
Project No.: | CIP 24-12 |
Project Title: | Barstow Avenue Street Improvements |
Location: | Barstow Avenue from Willow Avenue to Villa Avenue |
Scope of Work: | This project involves ±0.75 miles of street improvements on Barstow Avenue from Willow Avenue to Villa Avenue including removing and replacing existing asphalt pavement, replacement of concrete curb returns, concrete sidewalk, concrete curb and gutter, valley gutters, adjustments of utility boxes, manholes and utility valve boxes to finished grade, replacement of traffic striping, markings and signage, traffic signal modification, and reinstallation of traffic loop detectors. |
Estimate: | $958,087.75 |
Contract Time: | Thirty-Five (35) Working Days |
License: | California Contractor License Class A or C12 |
Open Date: | Tuesday, July 15, 2025 at 2:00 p.m. |
Bid Documents: | Digital copies of construction documents and all related bidding documents can be downloaded for free online at PlanetBids. |
Contact: | Matthew Morillas, Civil Engineer (559) 324-2374 |
2nd Contact: | Fernando Copetti-Visciglio, Supervising Civil Engineer (559) 324-2394 |
______________________________________________________________________________
Bid Results
- CIP 21-15 Armstrong Avenue Street Improvements
- CIP 19-18 Gettysburg Avenue Street Improvements
- CIP 24-05 Barstow Avenue Street Improvements
- CIP 25-03 Peg Bos Plaza
- CIP 24-02 Alluvial Avenue Street Improvements
- CIP 23-28 Barstow Avenue Street Improvements
- CIP 21-17 Barstow Avenue Rehabilitation
- CIP 21-17 Herndon Avenue Street Improvements
- CIP 25-01 Rubberized Cape Seal 2025
- CIP 23-06 New Rapid Rectangular Flashing Beacons
- CIP 24-06 New Bus Stops_B2
- CIP 24-24 Santa Ana Sidewalk Improvements
- CIP 24-13 New Bust Stop_B1
- CIP 20-12 Shepherd and Peach Traffic Signal
- CIP 23-14 Sierra Vista Sidewalk Improvements
- CIP 24-15 Tarpey Village – Water Meter Installation Project
- CIP 23-18 Letterman Dog Park
- CIP 17-04 Sanitary Pump Station “E” Pump Addition
ARRA and Whistleblower Protection
Labor Compliance
DBE Resource Page